Overseas Projects
Voltage, certification, delivery and site support
Scene imageContext
Start from the real problem
The hard part of overseas work is not the hardware but voltage differences, document completeness and delivery rhythm. Our scope covers all three.
Voltage mismatch
Destination voltage, frequency and connection standards differ.
Documents and time zones
Drawings, datasheets and manuals need the right language and format.
On-site support
Commissioning and training need remote and on-site coordination.
How the power chain is built
01
Requirement confirmation
Confirm load, voltage, site and delivery milestones.
02
Design and drawings
Configuration notes, interface drawings and installation conditions.
03
Build and test
Factory tests organised around project hold points.
04
Shipping and commissioning
Packing, documents and remote commissioning planned together.
Recommended configuration
Project considerations
- Destination standard
- Input and output confirmed against the local grid.
- Document language
- Manual and label languages agreed upfront.
- Packing and logistics
- Sea freight and unloading conditions included.
- Time zone and response
- Regional contacts reduce waiting across time zones.

예시 콘텐츠
Overseas park power package (illustrative)
Packaged and documented to destination standards, with commissioning support for the main contractor.