Kontak

Hubungi orang yang tepat untuk proyek Anda

Tell us the load, site conditions and delivery milestones; we will assign the right regional commercial and technical contact.

Pertanyaan Online

Ceritakan proyek Anda, kami akan menunjuk kontak komersial regional.

Ceritakan proyek Anda, kami akan menunjuk kontak komersial regional.

Kontak

  • Address: to be confirmed (replace with HQ address)
  • Switchboard: to be confirmed
  • Sales email: to be confirmed
  • Hours: Mon–Fri 09:00–18:00 (GMT+8)

Menunggu data

Headquarters location

Regional sales contacts

Contacts are assigned by region to reduce time-zone friction; names and emails can be filled in later.

Asia Pacific中文 / English / 日本語 / 한국어 / Bahasa / Tiếng Việt / ไทยRegional contact: to be confirmedEmail: to be confirmed
EuropeEnglish / Deutsch / Français / Italiano / Nederlands / Polski / Svenska / РусскийRegional contact: to be confirmedEmail: to be confirmed
Middle Eastالعربية / Türkçe / EnglishRegional contact: to be confirmedEmail: to be confirmed
AmericasEspañol / Português / EnglishRegional contact: to be confirmedEmail: to be confirmed

Three answers before you write

Most inquiries are about lead time, sizing basis and documents; covering these first saves a round of email.

01Line-frequency or high-frequency?

Prefer line-frequency isolation for surge loads, unstable grids and harsh sites; prefer high-frequency or modular for tight rooms, efficiency and easy expansion. Final choice follows the load list and site conditions.

02How is backup time decided?

Load power, required autonomy and battery discharge characteristics together decide it, along with footprint and floor loading. Provide the target duration and available space at design stage.

03Can we start small and expand?

Modular systems allow adding power modules; parallel designs need reserved cabinet space and distribution from the start. The choice depends on expansion pace.